From: route@monster.com
Sent: Thursday, October 01, 2015 3:58 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: drive tester
This resume has been forwarded to
you at the request of Monster User xapeix01
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
OBJECTIVE: |
To be involved in the Evolution of
Telecom |
|
EXPERIENCE: |
11/2010 - Present |
Ericsson |
FLORIDA |
|
Industry: |
|||
|
|
|||
|
RTU2 COMMISSIONING / INTEGRATION |
|||
|
New Site Builds, 2nd Carrier, 3rd
Carrier, 4th Carrier, and 5th Carrier Commissioning / Integration on Ericsson
UMTS 3206, 3518, 3418, 6601, (DC Power Termination to Node, Loading Basic
Package, Scripts and Upgrade packages with EMAS or with Smart Laptop Hot cuts
during the maintenance window Commissioning and Integration on Ericsson LTE
Enode (Loading Scripts and Troubleshooting) |
|||
|
6/2010 - Present |
Tmobile |
||
|
Industry: |
|||
|
|
|||
|
Fiber Hot Cuts to Make Network
Faster. |
|||
|
2/2009 - 5/2010 |
T-Mobile |
Connecticut |
|
|
Industry: |
|||
|
|
|||
|
3G UMTS Build Out |
|||
|
Responsible for UMTS (3G) Build
out of Ericsson 3106, 3206, and 3518 cabinets Consolidated 2G Nortel Cabinets
to Make Space to Drop UMTS Cabinet Wire Up and Commission T1's for UMTSHot
Cutovers to Fibertech to increase Speed of 3G Install NID Fiber Module to
Make True Fiber Reponsible for Day to Day Maintenance on 63
sites GSM AND UMTS in Fairfield,
CT |
|||
|
12/2008 - 1/2009 |
T-mobile |
||
|
Industry: |
|||
|
|
|||
|
3G UMTS T1 Commissoning |
|||
|
Responsible
for the Installation and Commissioning of T1 Adds for 3G UMTS Network
The Push was to Improve Performance for Holiday
Traffic and New Devices
The Project was completed |
|||
|
5/2008 - 12/2008 |
Northrop Grumman |
NYC, NY |
|
|
Industry: |
|||
|
|
|||
|
1) Commissioning3G, UMTS,
Microwave, RF, IP addressing, Programming, Wiring, Termination of Power,
Grounds, Fiber, and CoaxResponsible for the Build Out and Troubleshooting of
a UMTS Wireless Security Network for the City of NYConfigure and program the
Cisco 3750 Catalyst with HyperTerminal for this IP Microwave Based
NetworkAssign IP addresses to all equipment in the site and make sure it is
PING ableWork on and configure IP Wireless Equipment: INC, Digital Shelf
(UMTS), and RadiosProgram, configure, and Troubleshoot Ceragon Microwave
Units for Microwave Shots in a Microwave Based NetworkTerminate Power to APC
rackTerminate Fiber Optic Cable for High Speed DataWire up the Kathrein CCU
(EDT’s) at Main Cabinet and Satellite Boxes Coordinate with Team to be Most
EfficientWith Networking and RF put together, this is one Ultimate Wireless
Network2) Project ManagementWrite Scripts for AVL Units (GPS/Vehicle
Diagnostics) for Class 2 of Project with the use of Linux Software and Mincom
to Program Modems and GPS that are an Application to this Diverse
NetworkManage People in the Installation of AVL Units in City Vehicles Work
with City Officials in different Agencies to Meet RequirementsDocument each
Install with Pictures, Information, Time, and Device ID’sCommunicate well
with Team to Make Efficiency with updated Emails and Time Management
Skills.Work in the Production and Admin Frame (Back Office Software) to make
sure all Parameters are met upon Installation |
|||
|
3/2008 - 5/2008 |
Teksystems (TMobile) |
New York City, NY |
|
|
Industry: |
|||
|
|
|||
|
3G Ericsson 3106 (UMTS)
Troubleshooter2G Nortel BTS (GSM) S-8000's, S-12000's,S-18000's, E-Cell's,
Responsible for Preventative Maintenance and Troubleshooting Both GSM and
UMTS Networks in NYCT-1 wiring / troubleshooting / testingNew site
commissioningRadio adds and removalsAxxius 800 upgradesLine sweeps using
Anritsu site masterLMU (True Position) Troubleshooting and
commissioningAntenna Troubleshooting with EDT technology TMA
installation/commissioningCCI PA TroubleshootingMicrowave radio commissioning
and Troubleshooting(Lynx and Adtran 5.8 & 2.4 MHz)"Any Kind of
Troubleshooting or Work Necessary to Make the Network Run as Efficient as
Possible" |
|||
|
1/2008 - 2/2008 |
TEKsystems (Clearwire) |
Jacksonville, FL |
|
|
Industry: |
|||
|
|
|||
|
Responsible for Driving Testing
the Jacksonville Area to Improve Cell Site Performance. |
|||
|
10/2007 - 12/2007 |
Red River (Bank of America Corp.) |
Jacksonville, FL |
|
|
Industry: |
|||
|
|
|||
|
Responsible for Organization,
Programming, and Deployment of 6000 CISCO 7960G, 7906, and 7936 Polycom VoIP
phone systems For Bank of America Corporate Office in Jacksonville, FL. |
|||
|
9/2003 - 6/2007 |
Glotel (Tmobile) |
New York City, NY |
|
|
Industry: |
|||
|
|
|||
|
2G Nortel BTS (GSM) S-8000's,
S-12000's,S-18000's, E-Cell's, 3G prep UMTSResponsible for my own cluster of
cell sites (53)T-1 wiring / troubleshooting / testingNew site
commissioningRadio adds and removalsSwap outsAxxius 800 upgradesLine sweeps
useing Anritsu site masterLMU(True Position) Troubleshooting and
commissioningAntenna swaps(RFS/Andrews)with EDT technologyTMA
installation/commissioningCCI PA installationMicrowave radio commissioning
and Troubleshooting(Lynx and Adtran 5.8 & 2.4 MHz)Site manager conversions/upgradesT1
cutoversDrive Testing (Handovers/ db/ Dropped Calls) |
|||
|
1/2001 - 1/2002 |
Adex Corporation (AT&T
Wireless) |
Pensacola, Florida |
|
|
Industry: |
|||
|
|
|||
|
Nortel BTS 850
Macro/Urbancell(TDMA)New site commissioningComplete installationT1
testing/trobleshootingLine sweeps(Willtron)Drive Testing |
|||
|
9/2000 - 1/2001 |
Cell Tel International (AT&T
Wireless) |
Jacksonville, FL |
|
|
Industry: |
|||
|
|
|||
|
Nortel 850
Macro/Urbancell(TDMA).....Seattle, WATested and Commissioned sitesComplete
installationLine sweeps using WilltronSwapouts from Ericsson to Nortel |
|||
|
7/1999 - 1/2000 |
Field Telecom (Nortel) |
Orlando, FL |
|
|
Industry: |
|||
|
|
|||
|
Nortel DMS 100
switch.......Orlando, FLComplete installation |
|||
|
7/1998 - 1/1999 |
Media One/ Contractor |
Jacksonville, Florida |
|
|
Industry: |
|||
|
|
|||
|
Installed Multi Media Broadband |
|||
|
6/1997 - 1/1998 |
Ormond Engineering |
Ponte Vedra Beach, FL |
|
|
|
|||
|
Primary Power Distribution to
Marsh Landing Country Club and Residence.Included Conduit and Connection |
|||
|
EDUCATION: |
5/2005 |
T1 Troubleshooting |
US |
|
|
|||
|
Learned T1 fundamentals and basic
troubleshooting techniques. |
|||
|
5/1996 |
St.Augustine Vocational School |
US |
|
|
|
|||
Allen D. Nease |
US |
||
|
|
|||
Florida Community College of
Jacksonville |
US |
||
|
|
|||
|
SKILLS: |
Skill Name |
Skill Level |
Network troubleshooter |
Expert |
|
Excellent Driver with Clean Record |
Expert |
|
Cell Site Commissioner |
Expert |
|
Project Management |
Expert |
|
Proficient in Microsoft Word and
Exel |
Expert |
|
IP Based Network Engineer |
Expert |
|
Microwave Engineer |
Expert |
|
Fiber Installer |
Expert |
|
UMTS INTEGRATION |
Expert |
|
GSM |
Expert |
|
T1 Commissioner / Troubleshooter |
Expert |
|
LTE INTEGRATION |
Expert |
|
|
CAREER HIGHLIGHTS: |
16 yrs and counting. Full of
highlights!! |
|
REFERENCES: |
Reference Name: |
Upon request |
|
Phone: |
Upon request |
|
|
Type: |
Professional |
|
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||